![](https://low-architecten.be/wp-content/uploads/2021/06/start-of-construction-sbxl.png)
Today, We had the symbolic start of our new campus ‘Mutsaard’ in Brussels. The school includes a nursery, primary and secondary school for a total of 816 pupils and two sports halls.
The Mayor of Brussels, aldermen, VGC-member Sven Gatz and Flemish Minister for Education Ben Weyts started the demolition of the existing building, as a symbolic start. In the speeches beforehand, Ben Weyts called our design ‘beautiful’ and congratulated us for winning the be.exemplary award in 2018 for the design of this campus.
![](https://low-architecten.be/wp-content/uploads/2021/06/SBXL-School-Mutsaard-binnengebied.jpg)
Discover more about our project, ‘Campus Mutsaard’.
Read the news item at BRUZZ.be
Read and watch the news item at bx1.be